Up to 144 hours of uninterrupted operation. Sequential defrosting with hot gas, brine or electric heaters keeps production continuous.
Stainless steel inside. Wall and ceiling panels clad in stainless steel, the floor built as a fully welded tub with defined drains.
Adaptation to the product. Stainless steel or plastic belts, variable air flow and frequency-controlled belt shaking.
Pre-assembled modules. Fast installation and integration into practically any production line layout, on the floor, on a foundation or on a frame.
Belt washing. A basic system with a foam pump, upgradable to washing the entire interior of the unit.
Control. A PLC with recipes, temperature trend display and a 3D view of the system on a colour touchscreen.